World

EU funding backs new digital link from Egypt to Jordan

A grant for the Medusa network extension is intended to improve research connectivity, while the wider Mediterranean cable rollout continues.

How this story was made

This story was written with AI assistance from north-africa-middle-east-gulf.ec.europa.eu’s source documents. Its figures and quotations were checked against their sources, and Digitalage Desk reviewed and approved it before publication. It is published under the name of Peter Michaels, Editor.

Aerial view of Port Said, Egypt, showing its harbor, a ferry crossing, and the densely built waterfront.
Port Said, Egypt, in August 2026. Photo: Michael Botros, CC BY 4.0, via Wikimedia Commons (color-corrected, framed)

The European Union says an €11.1 million grant, channelled through the European Investment Bank, will support an extension of the Medusa communications network from its Egyptian landing point at Port Said to Jordan.

The November 19 announcement describes a terrestrial connection designed to improve access for research and education. Separately, the EIB is supporting the wider Mediterranean submarine cable system with a loan of up to €60 million.

These figures describe different financing instruments. The €11.1 million grant is not an additional €60 million loan, and the loan ceiling is not proof that its full amount has been disbursed.

A network for universities and researchers

Primary sourcenorth-africa-middle-east-gulf.ec.europa.eu: “north-africa-middle-east-gulf.ec.europa.eu: eu and eib back medusa strengthen mediterranean digital links and connect jordans research community 2026 11 19 en?prefLang=el”

The Commission says the new grant follows €40 million previously awarded through the EU’s Neighbourhood Investment Platform for a dedicated research and education subnetwork. Together, those grants total €51.1 million.

Officials say the planned links could make cross-border data exchange and scientific collaboration easier. EU Commissioner Dubravka Šuica specifically cited **SESAME, the regional research center in Jordan**, alongside Jordanian universities as prospective beneficiaries. The announcement does not say those institutions have already been connected through the new extension.

What is operating now

The wider Medusa project comprises more than 8,000 kilometers of cable and 21 landing points, according to the announcement. Its planned route connects European Mediterranean countries with North African landing points and includes Syria in the wider network footprint; the Jordan extension is a terrestrial link from Egypt. Its first phase, connecting France, Morocco and Tunisia, is complete and providing services. Deployment for the second phase is underway.

The system is designed around 24 fiber pairs and an open architecture. Its backers cite future demand from cloud services, 5G and artificial intelligence.

The next measure of success will be completed links, actual institutional connections and service performance once the planned extensions enter operation.

End of story